Failure Analysis: Motor-Pump Unit Shaft
A sanitary plant customer brought this failed motor-pump unit in for repair in 2014. Our analysis indicated that the shaft had been under a combined load condition of rotational bending and tension.
Case Study: Oil Analysis Finds Imminent Bearing Failure
Bodine received a call from a power plant customer on Christmas Day regarding troubles with a gear reducer, with further analysis showing imminent bearing failure due to insufficient lubrication.
Case Study: Vibration Analysis Finds Bad Bearing Fit
This customer contacted Bodine after observing a noticeable increase in vibration in its coal crusher, and the ensuing analysis found multiple problems — including Mechanical Type “C” looseness.
Meridian Junior/Senior High School
The Meridian Community School District, home to about 1,000 students, started a much-needed update of its facilities in 2012. Completed in 2016, the project turned four aging buildings into two renovated schools.
1,500 HP AC Motor Repair
Damage to this 1,500 HP, 1,200 RPM AC electric motor indicated it failed due to insulation degradation that ultimately caused a winding to short. Bodine performed rewinding and repair services to return it to working order.
Failure Analysis: Motor-Pump Unit Shaft
A sanitary plant customer brought this failed motor-pump unit in for repair in 2014. Our analysis indicated that the shaft had been under a combined load condition of rotational bending and tension.
Case Study: Oil Analysis Finds Imminent Bearing Failure
Bodine received a call from a power plant customer on Christmas Day regarding troubles with a gear reducer, with further analysis showing imminent bearing failure due to insufficient lubrication.
Case Study: Vibration Analysis Finds Bad Bearing Fit
This customer contacted Bodine after observing a noticeable increase in vibration in its coal crusher, and the ensuing analysis found multiple problems — including Mechanical Type “C” looseness.
Meridian Junior/Senior High School
The Meridian Community School District, home to about 1,000 students, started a much-needed update of its facilities in 2012. Completed in 2016, the project turned four aging buildings into two renovated schools.
1,500 HP AC Motor Repair
Damage to this 1,500 HP, 1,200 RPM AC electric motor indicated it failed due to insulation degradation that ultimately caused a winding to short. Bodine performed rewinding and repair services to return it to working order.